Pack ladder tier pricing
- Covers
- Standard listed sizes (SKUs)
- Price
- Fixed per-pack prices, shown online
- How you buy
- Add to cart and check out now
- Dispatch
- Fast dispatch for stock orders
Bulk purchasing · B2B
Volume pricing and repeat supply for purchasing teams, distributors and production lines. Send a parts list, a spec sheet or a previous order and we quote it as one request.
No payment now. We reply with price, minimum quantity and lead time.
Bulk pricing
Bulk prices are quoted on quantity, specification, material and long-term demand.
Two separate ways to buy. Online pack prices are not a bulk quote; a bulk quote is priced for your requirement and sent to you by email.
Many sizes at once
One line per part: size, material and hardness, then the quantity. Copy it straight from a spreadsheet or an old purchase order.
Example: 20 x 2.5 NBR 70 – 5,000 pcs · AS568-214 FKM 75 – 2,000 pcs
Or upload a spec sheet or drawing in the form below (PDF/JPG/PNG/WEBP)
Repeat orders
Send a previous order number, SKU, size or purchase list and we requote quickly.
Process
Quote and charges
Every cost is its own line, so you can see what is product, what is speed and what is one-off. Rush production, expedited shipping, tooling and special certification are never buried in the unit price.
Minimum quantities are quoted per requirement. Your quote states the minimum for each part, together with the price and lead time, before you commit.
Yes. Paste the whole list, one line per part with size, material, hardness and quantity, or attach a spec sheet or drawing (PDF, JPG, PNG or WEBP, up to 3 files). We quote it as one request.
When you have purchasing, quality or project requirements, we can provide the usual documents for that order: material information, compliance documentation, quality documentation, order and product documentation, and inspection-related documents, as well as company information and an invoice or proforma invoice. Special certificates, third-party testing, customer-specified report formats or extra testing are confirmed separately and may cost extra.
Every order, including large ones, can be paid securely online. For business orders an invoice can be provided and a purchase order (PO) can be accepted. Payment terms for qualified business orders can be discussed based on order size and cooperation requirements.
No. They are separate lines on the quote. For a new mold, standard tooling and production take 13 days or as fast as 7 days with rush service, subject to confirmation and additional rush charges. Other rush-production requests are quoted case by case. Expedited shipping or priority delivery options may be available upon request; additional shipping charges will apply based on destination, package size, weight, carrier, service level and required delivery time. Faster shipping speeds up transit only, not production.
Send the previous order number, SKU, size or purchase list in the form below and we requote quickly. You can paste the old purchase list straight into the parts list box on this page.
Engineering answers
Use these answers to identify the operating inputs and choose your next check.
Practical guidance for material selection, using operating conditions rather than one-size-fits-all rules.
Start with the fluid or chemical, temperature, motion, pressure and gland conditions. A material family can be a useful starting point, but the exact compound and application conditions still need validation.
Do not present family-level guidance as final compound approval.
Enter the operating medium and conditions to screen candidate material families.
Not automatically. Dynamic seals add friction, wear, lubrication, speed and surface-finish requirements that can change the best material or compound choice even when chemical compatibility looks acceptable.
Chemical compatibility alone is not dynamic-service approval.
Provide speed or cycle rate, lubrication, surface condition and gland geometry for dynamic review.
Temperature changes elastomer stiffness, compression behavior, fluid interaction and usable service margin. A temperature range for one compound or test condition should not be treated as a universal limit for every compound in the same material family.
Do not convert family or test temperatures into universal continuous-service limits.
Add normal and peak operating temperature to the material review.
Compounds within the same elastomer family can use different formulations, hardness levels and additives. That is why a family-level compatibility rating can disagree with a specific compound test and why exact compound review matters for critical service.
Do not average conflicting family-level and compound-level evidence.
Use family screening first, then validate the exact compound for the application.
There is no single percentage that is safe for every application. Dynamic seals are usually more sensitive to swelling because friction, wear and toughness can change, while static seals may tolerate more depending on gland fill and assembly conditions.
Keep service guidance separate from qualification-test limits.
Review swelling together with motion, gland fill and the exact compound test context.
Practical guidance for pressure and gland design, using operating conditions rather than one-size-fits-all rules.
No. Chemical compatibility does not establish pressure capability. High-pressure sealing also depends on extrusion clearance, hardness, gland geometry, pressure direction and whether a backup ring is needed.
Never infer a pressure rating from compatibility evidence.
Provide pressure, clearance, hardness and gland details for extrusion review.
Backup-ring need is driven by the combination of pressure, extrusion clearance, O-ring hardness, temperature and pressure direction. The correct number and location of backup rings also depends on whether pressure is one-way or can reverse.
Do not use a single pressure threshold as a universal rule.
Submit pressure direction, clearance and hardness for a backup-ring check.
No. Dynamic seals need a surface that is smooth enough to limit wear but still able to retain a lubricating film. An extremely polished surface can reduce lubricant retention and increase friction in some dynamic applications.
Surface-finish units and metrics must not be converted without a verified method.
Include surface finish and lubrication condition in dynamic seal review.
Practical guidance for vacuum and gas sealing, using operating conditions rather than one-size-fits-all rules.
Vacuum and gas sealing add permeability, surface leakage and outgassing concerns that are less important in many liquid applications. Squeeze, surface condition, compound permeability and lubrication can all change leak behavior.
Do not turn reference leak calculations into pass/fail approval.
Provide gas or vacuum conditions, temperature, seal type and cleanliness requirements.
Gas can dissolve into an elastomer under pressure and then expand during rapid depressurization, creating blisters, pits, fissures or rupture. Risk depends on gas, pressure, compound, cross section, temperature, soak time and decompression rate.
Do not use one pressure threshold as a universal safe limit.
Provide gas type, maximum pressure and depressurization profile for review.
Practical guidance for failure diagnosis and rfq, using operating conditions rather than one-size-fits-all rules.
A photo can help rank likely failure modes, but appearance alone is not enough to prove a single root cause. Pressure history, motion, temperature, media, lubrication, installation and gland condition are often needed to separate similar-looking failures.
Never present image-only diagnosis as a confirmed root cause.
Use the visible damage as a starting point and collect the service history before deciding the root cause.
At minimum, provide the sealing medium and whether the application is static or dynamic. Temperature, pressure, size, quantity and—when relevant—speed, lubrication, surface finish, extrusion clearance, hardness and gland details make the review much more reliable.
RFQ readiness does not equal service approval, stock confirmation or lead-time commitment.
Submit the operating conditions, size and quantity for engineering review and quotation.